DOKAFLEX 1-2-4 PDF

Doka Xtra. Dokaflex Load-bearing towers. – DOKA FORMWORK SYSTEMS. 2. The unbeatably fast table- form with the perfect fit. The manual system with. User information Dokaflex 5. – 07/ Ü. The Formwork Experts. Erecting the formwork. ○ Doka products and systems must be set up in. Download the catalogue and request prices of Dokaflex By doka italia.

Author: Mogami Tosar
Country: Russian Federation
Language: English (Spanish)
Genre: Sex
Published (Last): 10 November 2006
Pages: 396
PDF File Size: 10.83 Mb
ePub File Size: 19.25 Mb
ISBN: 563-8-95881-811-8
Downloads: 32462
Price: Free* [*Free Regsitration Required]
Uploader: Dourn

You can find more information on the use of cookies and opt-out options in our privacy statement. Create new comparison list. The Doka tables are pre-assembled, and save on both labour and crane time. In certain special situations, e. This symbol indicates that actions need to be taken by the user. New system offers super fast set-ups.

Slab formwork – Dokaflex – DOKA

Leave the beams under the panel-joints in place. MUST follow the instructions in ‘Reshoring props, concrete doiaflex and stripping out’. The stripping process is very efficient and cost-optimised because it is defined. Only the dead weight of the formwork and fresh concrete has been allowed for in calculating the deflection.

Required These cookies ensure the basic functions of dokwflex website. The Bolt-on caster set B turns the stacking pallet into a fast and manoeuvrable transport trolley.

Optimisation of beam and prop spacings Max. Adaptability to all layouts by telescoping the formwork beams downstand beams and floor extensions can easily be solved ‘within the system’ perfect adaptability to columns and walls optimising for diff erent slab thickness suitable for shoring fi ligree slabs Safe and fast to set up thanks to pre-defi ned system grid search-times are minimised by having only two diff erent lengths of beam the markings on the beams make the system quick to set up and check Durable and practical thanks to its sturdy system components high numbers of re-use cycles and reduced close-out costs, due to the shock absorbers and protectors on the system components site logistics are simplifi ed by odkaflex perfectly co-ordinated system components first-rate concrete surfaces, as any type of form-facing can be selected.

  DAVID SWENSEN UNCONVENTIONAL SUCCESS PDF

Hako’s Chemical on Demand system.

Hand-Set System | Dokaflex 1-2-4

This helps us to guarantee the best possible performance of our website, especially the constant improvement of the functionality of our website analysis of the user visita smooth shopping experience when using the Doka online shop or the placement of suitable advertising for users on certain platforms. Spacing of primary beams Slab Spacing of Position of Beam thickness d secondary beams forming support 20 cm A Tr Repositioning by forklift truck or pallet stacking truck A Slide-bolt for fixing the partition The forks can be inserted under either the broadside or the narrowside of the containers.

Failure to do so can cause acci- dents and severe even life-threatening damage to Closing the formwork health, as well as very great material damage. You can get to work right away with the piece-lists, plans, views, sections and perspective drawings that the program gives you.

Primary-beam spacing from table c Both for the layout and for spatial representations, Tipos-Doka sets an impressive new standard of visual presentation. General advantages of Dokaflex: Crescent Development Project More. The quantities are computed very simply, using the slide-rule, with no need for formwork planning. Meeting individual requirements regarding the concrete finish is no problem, as any type of form-facing can be chosen.

  78L18 DATASHEET PDF

Functional We can analyse the use of our website using these cookies. And wizards, so you can be sure of always getting the opti- your depot can make the best possible use of its stocks.

Skip to main content. Dokaflex can be adapted to the most complex layouts; it also optimises the formwork equipment needed beam and prop spacings are optimised depending on the layout, and in accordance with the floor load infill zones are formed quickly and easily without additional props by telescoping the formwork beams.

Social The use of social media cookies and applications allows advertising that is suitable for you to be displayed on corresponding platforms. DC Power System Solutions. This leads to a dramatic drop in the failure the stability of any part of the structure, or of any load, representing a very great risk to safety.

Triangular marks on the beams serve as a built-in ‘measuring tape’. Operational reliability is also enhanced by the high level of detail of the plans. Leuro Business Centre More. Using the method: When Doka accessory boxes are stacked, the bottom box must NOT dlkaflex one with a bolt- on castor set mounted to it.